We make sure that the volume available for inspection is corresponding to the milestones set up or / and to the final shipping date agreed by with the buyer.
We will count every pieces available on site and their current production status.
Are the items on site matching the buyer's requirements and /or common furniture export quality standards.
Are the packing, packaging and labeling matching buyer's requirements.
Carton drop test (ASTM D5276), Smell test, Function test, Color test, Adhesive test (ASTM D3359-02), Abuse test, Resistance test, Hi-pot test, Construction check.
PRODUCTION STATUS AND CAPACITY